About Van Bi (Ball Valve)



We provide a wide range of excellent quality commercial valves to customers throughout South and also West Texas. We are the leading supplier of top quality YVC valves, offering high quality building with powerful style attributes. YVC is a global existence in the valve industry and is extremely concerned by users in a variety of industries. We carry YVC products such as sphere valves, butterfly shutoffs, gate valves as well as inspect valves.

For more information concerning our variety of shutoff options, see the information on this page or please call us. Just how to make plaster ceiling. With gypsum making system is a favored part in designing and also creating interior area, it adds to design, audio insulation, warmth therapy as well as covering flaws in building and construction. building, at the same time it is highly fire immune. Building plasterboard sinking effectively, professionally, technically covered with plasterboard outside to bring aesthetic variables in addition to high safety and security. Video tutorial on how to construct a professional plaster ceiling.

Structure of completely submersible plaster ceiling:
- Main bar is a bearing bar put on hold from the ceiling with clusters of booster and suspension bars.

- Additional bar associated with the primary bar, speaking to the ceiling straight.

- Participants: bars attaching the wall surface or wall surface with the major bar and also side bars.
- Plaster board is a ceiling board gotten in touch with complementary bars, main bars and bars to cover the bone bar system to create the ceiling surface.

- Devices: to link plaster bars as well as panels together to develop a completely immersed gypsum ceiling system.

Exactly how to make an ideal ceiling gypsum ceiling, reliable and proper methods: After you have completed the ceiling and also roof covering, need to prepare the products and also proceed with the following steps:

1. Decision of height of ceiling

- Usage laser or water pipe Nivo to establish the elevation of the ceiling

- Mark the setting of the ceiling above the column or wall, Continue reading generally choose the height of the wall at the bottom of the ceiling frame.

2. Repaired the wall boundary bars

You can describe more lovely plaster ceiling below!

You use a drill, hammer nail to repair the wall bars on the wall surface. And also the securing holes 1 room smaller sized than 30cm to Top Energy guarantee security.

3. Split the ceiling

Split the ceiling surface with the distance suitable to the range of the center of the major bar compared sideways bars 800mm x 900mm

4. Hanging TY

You fixed Ty suspension point with a direct drill with 8mm drill, linked by Ke as well as Pat switches over. The distribution of distance between companies is 1200mm and also the local firm is 610mm from walls.

5. Mount the main bar

Key rods are mounted at distances of 800 - 1200mm. The conventional professional is 1000mm.

6. Mount the complementary bar

Mount the primary bar and also primary bar straight or indirectly. After the installment is finished, the view bar is modified and the framework is positioned neatly, uniformly as well as the surface area is flat.

7. Installment of plasterboard ceiling

Plaster employee

Installment of the first plasterboard:

- Examine home plate is undamaged or not.

- Screw the sheet with screws to ensure that the range between the screws is not more than 20mm.

- Installation in such a way that the length of the plasterboard and side bars is perpendicular to each other.

Setup of the 2nd plasterboard:

- Setup of the second plate must capture skewed with the side bar and also pay attention to leave small spaces.

Shielded bare plaster for warm summers

8. Managing loose powder covering joints

The connection between the sheet and also the screw head need to be covered with lures. See to it that when covering the surface area with dough, it must be flat to stay clear of surges. When Check over here painting the lure, in between the panels, tape the surface mesh to stay clear of splitting. The final stage is to use a saw to reduce as well as trim the ceiling. Hence, the building and construction process for plaster ceiling is completed,

Leave a Reply

Your email address will not be published. Required fields are marked *